RESTORING THE ROOFLINE OF WESTMINSTER ABBEY

RESTORING THE ROOFLINE OF WESTMINSTER ABBEY

Here at JTC Roofing we are experts in all aspects of lead roofing and, over the years, have conducted a wealth of historical renovations. Our impressive portfolio details an extensive range of ancient buildings and period properties which, thanks to the dedicated team here at JTC, have seen their roof lines repaired, refurbished and completely reconstructed.
One such building which JTC Roofing had the privilege of working on was Westminster Abbey – one of London’s most significant landmarks – and our work on Chapter House was part of a large-scale renovation project which took place over the last couple of years.

Chapter House, one of London’s oldest buildings, was first built between 1245 and 1253 under Henry III and was erected concurrently with Eastern parts of the Abbey. Originally used by Benedictine monks it was a place for daily meetings and was a hub of religious activity. It later became a meeting place for the King’s Great Council and the Commons, the predecessors of modern day Parliament. Then, in the mid-16th Century it became a store house for the records of the Exchequer, providing the octagonal building with a varied and highly prestigious background.

The historic building underwent extensive restorations in 1872, which was headed by Sir George Gilbert Scott. These restorations included a leaded tent-lantern roof which was designed by Scott and constructed on an iron frame.

Now in the guardianship of English Heritage, and under the care and management of the Dean and Chapter of Westminster, it has been subject to injury from various sources over the years. Smoke from Battersea Power Station, traffic pollution and corrosive weather has all caused damage to the building’s structure and aesthetic and, as such, the English Heritage recently funded a major programme of work to Chapter House. The £3 million restoration project comprised repairs to the roof, gutters, stonework on the elevations and flying buttresses and utilised an extensive team of highly experienced professionals.

One of these teams were the professionals from JTC Roofing – who were more than willing to take on the prestigious task! Restorative construction was needed on the roof and work was carried out under the architectural supervision of specialist building restoration and conservation experts Stone Technical Services of Darlington.

One of the major aspects of the project was opening up the lead work to rolls and fitting new hidden clips. Roof sheets were also re-nailed to ensure optimum strength and security. Throughout the project, every step was taken to make sure the roof renovation was in keeping with the rest of the period property and its medieval features and heritage tradition. As a result, all lead used was sand cast, a material which records show, when applied and fitted correctly, can have an outstanding lifespan. Upon completion, the entire roof had to be redressed, paying particular attention to the finish and aesthetic appeal.

More Projects

VMZINC PROJECT – THE DUTCH BARN, GROVE FARM, FRANKTON

This project was designed by Lloyd Thomas Architects, the owner being Phil Maffey.

LINDAB MATERIAL IN DERBYSHIRE USING STANDING AND ANGLED SEAMS

Stuart White, Specification Manager at Lindab UK came to visit our barn conversion project, using GreenCoat® PLX Pro BT Forest Green...

ALUMINIUM PROJECT , SOUTH SHROPSHIRE

Commissioned by Arroll Architects , (Andrew Arroll being of York Minster fame.) , and supplied by Metal Solutions, this full Roof Renovation project used Traditional Textures aluminium, Cladding, Roofing and Gold Box Bays.

LEADWORK RENOVATION, WARWICK CASTLE

Following the incorporation of JTC Roofing Contractors Ltd in 1996 a long road began on important, ancient and touristic ally attractive buildings.

ROOF RESTORATION , DURHAM CATHEDRAL

Renowned as a masterpiece of Romanesque architecture, Durham Cathedral has been described as the greatest Norman building in England. The creation of the Cathedral first began in 1093 and was largely completed within the next 40 years.

CARN EITHEN – HOME IN THE WATER

This project was designed and headed by Architect William McMorran of Architectonicus, from Tedstone Delamere, Bromyard. The Principle contractor being Jenkinson Builders. The owners being Mr and Mrs Tufnell.